Qatif Onshore Maintain Potential

24 Apr

Scope of work:

⦁ Installation, Testing & pre-commissioning of complete facilities of new 40 Oil Drill Sites and 50 water injection drill site, consisting of 120 Oil/ Water Injection well head pipes, flow lines, header and manifold, oil trunk lines and W. I. Flanks and scraper launchers and receiving facilities. The work involves the installation, testing and pre-commissioning of the entire Mechanical Piping, Electrical Instrumentation & Communication requirements and also involved 20 each Thrust Boring / HDD work on government highways and 120 HDD works for FOC crossings, Duct bank works. Also includes cement lining works for 48-kilometer of existing flanks, modification of existing water supply and water injection wells.

Project Details:

Type of Project : WUR

Location : Qatif Abu Safah

Size & Length of Pipeline : 8-12 inch 150 km

: 16-20 inch 60 km

: 24-30 inch 130 km

Duration : 2002 to 2005