Onshore Maintain Potential (Shaybah)

24 Apr

Scope of work:

Onshore Oil Maintain Potential, Construction of well head and its flow lines, Test lines and Trunk Lines along with all the associated facilities like, Civil, Mechanical, Electrical, instrumentation and communication job.

Communication job involves:

Install, Test & Cable termination of analog JB’s, Digital JB’s, disconnect switches, etc.

Install, Cable, Terminate and software configuration of RTU’s at different locations Lay, Terminate and Test the buried Fiber Optic Cables from each RTUs up to the designated area.

Install, Calibrate and test all field instruments like temperature, pressure and level indicators, gauges and transmitters etc including choke valves & MOVs.

Construction of RTU shelters and installation of RTUs, Fiber Optic Cable Patch panel, OTN MUX & marshaling cabinet etc in the RTU shelter including battery power system. Installation of test leak detection sensors at all sectionalized valve areas. Also the scope involves the construction, reroute and by passing of the following sizes of gas lines:

Project Details:

Type of Project : WUR

Location : Shaybah

Size of Pipelines : 16-20 inch -45 km

: 24-32 inch- 37 km

: 36-42 inch- 42 km

: 46-48 inch- 56 km

Duration : 2005 to 2006